We acquire WordPress agencies. Is yours next?

SRB/ENG

Home  /  Case Studies  / 

A deleted 2,800-page site rebuilt from the web archive in 5 days

Emergency Site Recovery · Hurricane-impact windows · Florida

The whole site was deleted, backup and all. We rebuilt it from the web archive in 5 days.

A Florida hurricane-impact window brand lost its entire website, then got handed a backup more than two years out of date. It was spending around $50,000 a month on Google Ads pointing at pages that no longer loaded. Every hour offline was money burned. We reconstructed the site page by page from the Internet Archive and had it live again inside a week.

95%+

Pages recovered from the archive

5 days

From dead site to relaunch

$50K/mo

Ad spend no longer wasted

15+

Specialists on the rebuild

Client snapshot

A manufacturer and installer of hurricane-impact windows and doors, with nine showroom locations across Florida and a long track record in coastal home improvement. Their website was large by design: separate pages for every product line, every window and door style, and every service area, all feeding a heavy Google Ads program. That is around 2,800 pages of location and product content, and the paid campaigns lived or died on those landing pages being up.

What went wrong

The site had been maintained by an outside vendor. It had picked up malware, and the hosting provider had been sending warnings about the site’s status. Those warnings went unanswered. The host eventually took the site offline and, once its retention window passed, purged the site and its stored backup at the same time. Nothing current was left running anywhere.

The only copy that surfaced afterward was a backup more than two years old. It was missing years of pages, products, and location content, so restoring it would have rolled the business back to a version of itself that no longer matched its ads, its inventory, or its market.

By the time the company realized how bad it was, sales had already dropped and the site was simply gone. Around $50,000 a month in Google Ads was still running, sending expensive clicks to dead pages. Organic rankings were decaying by the day. And they had no access to the hosting or the domain to work from.

How we rebuilt it

There was no clean copy to restore, so we went to the places the real site still existed: the Wayback Machine at the Internet Archive, plus Google’s cache. Those snapshots held the current site, the one that had actually been live before the deletion.

From there it became a logistics problem as much as a technical one:

We did all of it without hosting or domain access to the original site, and we kept the work quiet at the client’s request, so it stayed clear of the vendor relationship they were still untangling. The whole thing ran on the archive, a spreadsheet, and a team that could move together fast.

The outcome

The full site was live again in five days. Because we brought the ad landing pages back first, the $50,000-a-month campaigns stopped funding dead clicks almost immediately. Rankings held through the switch, because the restored URLs and content matched what the archive, and Google, had already indexed.

Most teams would call a deletion with no backup unrecoverable. Reconstructing roughly 2,800 pages from the public archive in under a week is not luck. It takes a method, the right tools, and enough hands moving in parallel to beat the clock.

Metric

Before

After

Site status

Deleted, no usable backup

Live again, ~2,800 pages, in 5 days

Best available copy

A backup 2+ years out of date

Current site, rebuilt from the archive

Paid ad spend

~$50K/mo to dead pages

Protected, live landing pages

Organic rankings

Decaying daily

Held through the cutover

Tech and tools

WordPress

Wayback Machine (Internet Archive)

Google cache

Screaming Frog

Managed WordPress hosting

Cloudflare

Services used on this project

More case studies

Related projects.

eCommerce & Retail

An online store taken over at 80% and launched on deadline in 2 days

Professional Services & B2B

Nine home-builder websites rebuilt in about 20 days after a platform lockout

White gradient
Create your
Project
Website
Brand
Contact Us!
Work
With Us